Engineering and Construction
Before any work can be done, Midwestern performed soil analysis and testing to ensure the ground was suitable for the grain bin foundation. We found that much more dirt was needed to prepare the top soil properly.
Major Dirt Work
Tons of dirt had to be moved and then worked to prepare it for a concrete foundation. We have major dirt moving equipment for any size project.
Concrete and Structural Fill
A massive amount of concrete is needed for grain bins, in order to be the structural support required for the larger metal structure. We have decades of experience with complex concrete fill projects.
On-Site Assembly
Obviously on-site assembly is required. What’s less obvious is how much experience we bring to your site, and how much care we take to leave your site better than we found it.